Eric and his team delivered our dream deck: a custom covered composite build featuring electrical outlets and a ceiling fan. Beyond the deck, they handled a large scope of work, including new siding, gutters, soffit, a natural gas line for our grill, and several other exterior repairs. The project team consisted of highly skilled carpenters who clearly take pride in their work.
What has impressed us the most is that Eric has remained incredibly responsive to every little question we’ve had in the year since the job wrapped up. It’s rare to find a builder who provides this level of support. If you are looking for quality and reliability, we cannot recommend Horizon enough!
The photos are from before Eric and his team came back to do the final trim and touch ups! It’s all completed now and looks even better!
As I wanted to improve the overall look of the patio anyway, I decided to go with a product that Eric recommended called ScreenEeze. The result was awesome.
Eric’s crew Aaron and Ryan were the epitome of professionalism from the time they started through when they finished cleaning up.
I would absolutely recommend them for home renovation projects
Project details: project 1) master bath conversion from old leaking sauna to tiled shower area with new lights, switches, exhaust fan, shower sets, bench, shampoo niche, and new ceiling; project 2) conversion of jacuzzi (never used) to new storage space to increase total storage space for master suite with removal of wall fixtures, fixing existing drywall, installing new drywall, new storage doors, new light, new switch, new tiled floor and painting of both drywall and door.
Challenges: 1) winter storms and cold temperatures; 2) jacuzzi conversion project was a new task not included in original scope of work; 3) existing bended drywall (not straight) to apply tiles on, 4) some of the existing floor tiles are in half or fractional around old jacuzzi area, which either have to be removed or a transition piece would be needed to connect with the floor of new storage space.
Outcomes: 1) both projects completed on time with solid quality; 2) bended drywall was adjusted so that tiles (large plank style) can be applied; 3) fractional floor tiles were removed so that no transition piece would be needed and existing floor tiles and new floor tiles for the newly added storage space were connected and harmonized as one piece.
Hire again? Yes, definitely, already discussed several additional projects to do in the house for later in the year.